Featured
No records found.
Project Details
Project Website
See in GEF websiteImplementing Agencies
Projects News, Events & Opportunities
No records found.
Project Indicators
INDICATORS ON PROJECT RESULTS
Indicator | Target | Baseline | Value | Source of verification |
---|---|---|---|---|
Extent to which implementation of comprehensive measures to achieve low-emission objectives has improved | 4 | 3 | 0 | 1. Not adequately 2. Very partially 3. Partially 4. Largely |
direct project beneficiaries disaggregated by gender. | direct project beneficiaries disaggregated by gender. | 50, 25 women | 0 | Participatory approaches to project activities that support equal participation |
institutions that built their capacities to meet the PA ETR | 20 | 10 | 0 | New institutions related to key sectors |
Rate of stakeholders outreached about climate change transparency | 80% | 0 | 0 | At least two outreach events are assumed per year. |
The Climate transparency mechanism/unit is institutionalized | Yes | 0 | 0 | MINSEDD engagement trough the NCCP |
The inter-ministerial coordination mechanism or national committee is institutionalized | Yes | 0 | 0 | MINSEDD engagement trough the NCCP |
# of beneficiaries trained on the 2006 IPCC methodologies | 30 | 0 | 0 | Series of trainings on 2006 IPCC methodologies |
# of sectors of the GHG inventories calculated with 2006 IPCC methodologies | 5 | 1 | 0 | |
# of sectors with improved activity data and country specific EF | 3 | 0 | 0 | Partnerships are sealed with relevant institutions |
# of protocols developed and adopted for data management sharing among different sectors (energy, AFOLU, Waste, industry…). | 3 | 0 | 0 | |
# of sectors integrating the online MRV platform for stocking and reporting GHG data | 5 | 1 | 0 | |
# lessons learned or feedbacks shared on the regional or international level | 3 | 0 | 0 | 3 possible feedbacks or lessons learned shared with the ECOWAS MRV network |
# of methodologies developed to keep track of progress in the implementation of NDCs and transparency | 1 | 0 | 0 | |
Rateof sectors adopting the NDC tracking methodology as a national climate change policy | 100% | 0 | 0 |
Project Implementation
STATUS OF PROJECT OUTPUTS AND ACTIVITIES
1.1 Institutional arrangements for climate transparency are in place and effective
1.1.1 Stakeholders sensibilization, including policy makers, on the importance of climate transparency implemented
>to be provided upon approval of project document<
Existence of a musical work and a clip for the awareness campaign of the actors. Sensitization done during meetings, forum, workshop and training
Existence of a musical work and a clip for the awareness campaign of the actors. Sensitization done during meetings, forum, workshop and training
100%
1.1.2 Design and adoption of a long term strategy on climate transparency realized
>to be provided upon approval of project document<
Design and adoption of a long-term strategy on climate transparency underway, draft available
Design and adoption of a long-term strategy on climate transparency underway, draft available
50%
1.1.3 Climate transparency mechanism/unit institutionalized
>to be provided upon approval of project document<
-Draft law on climate change in Côte d'Ivoire developed
-Draft law on climate change in Côte d'Ivoire developed
75%
1.1.4 Establishment of an inter-ministerial coordination mechanism or a national committee with all stakeholders (public sector, private sector, civil society, academia, etc.)
>to be provided upon approval of project document<
8 MEMORANDUM OF UNDERSTANDING on GHG inventories have been developed and will be signed with the sectors to facilitate data collection on GHG inventories and the MRV system being deployed. A long-term climate strategy is being developed.
8 MEMORANDUM OF UNDERSTANDING on GHG inventories have been developed and will be signed with the sectors to facilitate data collection on GHG inventories and the MRV system being deployed. A long-term climate strategy is being developed.
50%
1.1.5 Develop a long-term strategy to ensure sustainability of project activities/results beyond project completion
>to be provided upon approval of project document<
Design and adoption of a long-term strategy on climate transparency underway, draft available
Design and adoption of a long-term strategy on climate transparency underway, draft available
75%
2.1 Enhancement of greenhouse gas inventories, including improved methodological guidance
2.1.1 Recalculation of the previously submitted GHG inventories using the IPCC 2006 guidelines and development of a coherent time series
>to be provided upon approval of project document<
GHG emission inventories was recalculated in the agriculture, forestry and energy sectors . These recalculations identified inconsistencies in terms of methodologies previously used in the conduct of NCT GHG inventories.
GHG emission inventories was recalculated in the agriculture, forestry and energy sectors . These recalculations identified inconsistencies in terms of methodologies previously used in the conduct of NCT GHG inventories.
100%
2.1.2 Development of country specific emission factors and activity data, with a special focus on energy and AFOLU
>to be provided upon approval of project document<
An analytical study of level 2 Emission Factors (EF) was developed in the Agriculture, forestry and energy sectors Il allowed to improve activity data and country specific emission factors. Actually.
An analytical study of level 2 Emission Factors (EF) was developed in the Agriculture, forestry and energy sectors Il allowed to improve activity data and country specific emission factors. Actually.
100%
2.1.3 Development and implementation of a protocol for QA/QC for GHG inventories
>to be provided upon approval of project document<
QA/QC manual available and Forty-one (41) national actors (including 4 women and 37 men) have been trained on the QA/QC procedures manual.
QA/QC manual available and Forty-one (41) national actors (including 4 women and 37 men) have been trained on the QA/QC procedures manual.
100%
2.1.4 Relevant entities trained on GHG inventories and on the use of the IPCC 2006 guidelines
>to be provided upon approval of project document<
The capacities of twenty-five (25) national experts were strengthened on greenhouse gas (GHG) emission inventories and the use of IPCC 2006 methodologies, during a workshop. Côte d'Ivoire now has experts capable of using the IPCC 2006 methodologies
The capacities of twenty-five (25) national experts were strengthened on greenhouse gas (GHG) emission inventories and the use of IPCC 2006 methodologies, during a workshop. Côte d'Ivoire now has experts capable of using the IPCC 2006 methodologies
100%
2.2 Design of a domestic MRV system
2.2.1 Data management sharing protocols developed and adopted
>to be provided upon approval of project document<
50%
2.2.2 Data collection widened and improved, including the design and establishment of an online MRV platform for stocking and reporting of GHG data
>to be provided upon approval of project document<
Feasibility study of the MRV system available
Feasibility study of the MRV system available
100%
2.2.3 Design of sectorial interfaces for the domestic MRV system
>to be provided upon approval of project document<
MRV feasibility studies available
deployment of the system in progress, computer equipment acquired, web platform under development
MRV feasibility studies available
deployment of the system in progress, computer equipment acquired, web platform under development
65%
2.2.4 Peer exchange program at the regional level through the collaboration with the South-South ECOWAS network on MRV
>to be provided upon approval of project document<
Participation in COP 26 in Glasgow
Participation in COP 26 in Glasgow
75%
2.2.5 Share information on project implementation and on results and lessons learned, into the Global Coordination Platform
>to be provided upon approval of project document<
Information on project implementation, results and lessons learned are regularly posted on PIMS .
Information on project implementation, results and lessons learned are regularly posted on PIMS .
75%
3.1 Progress tracking tool on NDC and transparency in place
3.1.1 Review of information provided in the NDC, including quality review of baseline projections
>to be provided upon approval of project document<
Activity organized as a structured national dialogue on climate transparency with the objective of building a strengthened transparency framework for Côte d'Ivoire to monitor climate actions. The activity involved all national structures
Activity organized as a structured national dialogue on climate transparency with the objective of building a strengthened transparency framework for Côte d'Ivoire to monitor climate actions. The activity involved all national structures
100%
3.1.2 Develop methodology to keep track of progress in the implementation of NDCs and transparency in place
>to be provided upon approval of project document<
Activity organized as a structured national dialogue on climate transparency with the objective of building a strengthened transparency framework for Côte d'Ivoire to monitor climate actions. The activity involved all national structures
Activity organized as a structured national dialogue on climate transparency with the objective of building a strengthened transparency framework for Côte d'Ivoire to monitor climate actions. The activity involved all national structures
100%
3.1.3 Implement adoption of progress tracking tool among key national institutions
>to be provided upon approval of project document<
Activity organized as a structured national dialogue on climate transparency with the objective of building a strengthened transparency framework for Côte d'Ivoire to monitor climate actions. The activity involved all national structures
Activity organized as a structured national dialogue on climate transparency with the objective of building a strengthened transparency framework for Côte d'Ivoire to monitor climate actions. The activity involved all national structures
100%