Project Implementation

STATUS OF PROJECT OUTPUTS AND ACTIVITIES

1.1 Institutional arrangements coordinating information and data collection from the agriculture and land use sectors into ETF processes and reports enhanced
1.1.1 Coordination mechanism strengthened, integrating relevant authorities from the agriculture and land use sector into national UNFCCC reporting processes
Output 1.1.1 progress
30%
1.1.2 National ETF monitoring and reporting roadmap for the agriculture and land-use sectors prepared and adopted
Output 1.1.2 progress
15%
1.1.3 Capacity developed to clarify measurement and reporting of key NDC information (baselines, business-as-usual scenarios, targets) and support provided for ETF reporting in the agriculture and land-use sectors
Output 1.1.3 progress
15%
1.1.4 Cambodia's engagement strengthened in the agriculture and land-use sectors with international transparency-related processes under the UNFCCC
Output 1.1.4 progress
60%
1.2 Best practices on ETF reporting processes, information gathering, system infrastructure, methodologies in the agriculture and land-use sectors disseminated to relevant priority sectors (e.g. energy, industry/trade, transportation)
1.2.1 Multi-sectorial coordination mechanism strengthened integrating relevant authorities, data and information systems into national UNFCCC reporting processes
Output 1.2.1 progress
30%
1.2.2 ETF lessons learned from agriculture and land-use sectors monitored, captured, up-scaled and shared to enhance wider national, regional and global reporting (e.g. via the Global Coordination Platform)
Output 1.2.2 progress
15%
1.2.3 Peer exchange program on transparency activities established for relevant priority sectors
Output 1.2.3 progress
30%
2.1 Reporting on inventories of emissions sources and sinks and mitigation activities from agriculture and land-use sectors strengthened
2.1.1 Regular and systematic documentation and archiving process established to ensure accuracy and sustainability of the inventory, including quality assurance and quality control, in the agriculture and land- use sectors
Output 2.1.1 progress
15%
2.1.2 GHG information management system (MIS) and infrastructure for agriculture and land-use sectors upgraded (interface w/ 3.1.3)
Output 2.1.2 progress
15%
2.1.3 Capacity and system hardware developed for relevant institutions at different levels to adopt and mainstream latest tools and methodologies to develop country specific emissions factors, improve activity data and better quantify the impact of mitigation policy measures
Output 2.1.3 progress
30%
2.1.4 National/sectoral reports prepared and submitted on inventory of emissions sources and sinks and emissions reduction activities from agriculture and land-use sectors consistent with latest UNFCCC guidance
Output 2.1.4 progress
30%
3.1 Monitoring and reporting of NDC priority adaptation actions in the agriculture and land-use sectors strengthened
3.1.1 Assessment of relevant good practice methodologies and frameworks for monitoring and reporting NDC priority adaptation actions in the agriculture and land-use sectors
Output 3.1.1 progress
60%
3.1.2 National/sectoral appropriate indicators and monitoring and reporting framework developed for NDC priority adaptation actions in the agriculture and land use sectors
Output 3.1.2 progress
45%
3.1.3 Adaptation information management system (MIS) and system infrastructure for agriculture and land-use sectors upgraded (interface w/ 2.1.2)
Output 3.1.3 progress
25%
3.1.4 Capacity and system infrastructure developed supporting relevant institutions at different levels to adopt and mainstream monitoring and reporting processes for NDC priority adaptation actions in the agriculture and land-use sectors (interface w/ 2.1.3)
Output 3.1.4 progress
20%
3.1.5 National reports prepared and submitted on priority adaptation activities in the agriculture and land-use sectors consistent with latest UNFCCC guidance
Output 3.1.5 progress
45%